Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2020, 07:49 AM
  • 22 0293_22 0292_01282020_000557.mp4

Date
01/27/2020
W/O
878204
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16579
Time
11:49 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7288
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_808204_TV22014_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0292
Downstream MH
22 0293
Dir. of Survey
Upstream
Length Surveyed
350.3 ft.
Total Length
350.3 ft.
Structural Index
3
Structural Quick
413M
Structural Rating
352
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
490
Pipe schematic from manhole 22 0292 to 22 0293
MH: 22 0292MH: 22 0293upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02930 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish65.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"72.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"79.2 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES92 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES138.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"219.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"223.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"232.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"348.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start348.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start348.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start350.3 ft. MWL - Water Level, 15 %of cross sectional area350.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK350.3 ft. MWM - Water Mark, 20 %of cross sectional area350.3 ft. AMH - Downstream Manhole, Survey Begins - 22 0292

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    258.3 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    271.1 ft. - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

Observations (21)

DistanceCodeObservation
211.7TFA
0MWL
118.2TFA
126.9TFA
285TFA
2SSS
0MGOCONNECTION AT MH 9 O'CLOCK
350.3AMH22 0293
131.1TFA
349.4SSS
350.3MGOCONNECTION AT MH 9 O'CLOCK
258.3FM
2DAGS
207.9TFA
349.4DAGS
271.1FL
0MWM
2SAP
349.4SAP
0AMH22 0292
278.2TFA

Properties (6)

additional_info
SC398774
custom_field_two
2
customer
LACSD
datetime
2020-01-27T23:49:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false