Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2020, 09:12 AM
  • 22 0289_22 0288_01282020_012408.mp4

Date
01/28/2020
W/O
808204
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16575
Time
1:12 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7288
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_808204_TV22014_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0288
Downstream MH
22 0289
Dir. of Survey
Upstream
Length Surveyed
264.8 ft.
Total Length
264.8 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
364
Pipe schematic from manhole 22 0288 to 22 0289
MH: 22 0288MH: 22 0289upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02891.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish7.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"64.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"113.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"227.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"243.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"262.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start262.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start262.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start264.8 ft. MWM - Water Mark, 20 %of cross sectional area264.8 ft. MGO - General Observation - COCKROACHES IN MANHOLE264.8 ft. MWL - Water Level, 10 %of cross sectional area264.8 ft. AMH - Downstream Manhole, Survey Begins - 22 0288

Observation photos (3)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2SAP
151.3TFA
0MWM
200.3TFA
264.8AMH22 0289
70.9TFA
37.4TFA
0MGOCOCKROACHES IN MANHOLE
0MWL
257TFA
21.6TFA
263.7DAGS
102.7TFA
2DAGS
2SSS
175.5TFA
263.7SAP
0AMH22 0288
263.7SSS

Properties (6)

additional_info
SC398774
custom_field_two
2
customer
LACSD
datetime
2020-01-28T01:12:39-08:00
documentation
PRO PIPE
is_lateral_inspection
false