Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 28, 2020, 11:10 AM
  • 22 0281_22 0280 _01282020_032205.mp4

Date
01/28/2020
W/O
808204
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16567
Time
3:10 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7288
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_808204_TV22014_JAN2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0281
Downstream MH
22 0280
Dir. of Survey
Downstream
Length Surveyed
241 ft.
Total Length
241 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
235
O&M Index
2
O&M Quick
312H
O&M Rating
97
Overall Index
2
Overall Quick
Overall Rating
332
Pipe schematic from manhole 22 0281 to 22 0280
MH: 22 0281MH: 22 0280downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02812 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"75.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"96.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"104 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.1 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"156.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"159.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.9 ft. OBM - Obstacles Pipe Material, 15 %of cross sectional area, from 05 to 07 o'clock239.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish239.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish239.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish241 ft. MGO - General Observation - CONNECTION AT MH 3 AND 12 O'CLOCK241 ft. AMH - Downstream Manhole, Survey Ends - 22 0280

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Pipe Material, 15 %of cross sectional area, from 05 to 07 o'clock

    210.9 ft. - Obstacles Pipe Material, 15 %of cross sectional area, from 05 to 07 o'clock

Observations (20)

DistanceCodeObservation
159.8TFC
2SSS
239.5SSS
210.9OBM
43.1TFA
0MWM
239.5SAP
239.5DAGS
2DAGS
241MGOCONNECTION AT MH 3 AND 12 O'CLOCK
0MWL
156.2TFC
75.5TFA
104TFC
0AMH22 0281
241AMH22 0280
2SAP
100.3TBA
148.1TBA
96.9TBA

Properties (6)

additional_info
SC398774
custom_field_two
2
customer
LACSD
datetime
2020-01-28T03:10:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false