Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2020, 08:59 AM
  • B 0778_B 0777 _03162020_020829.mp4

Date
03/16/2020
W/O
813373
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00112
PipeID
P09245
Time
1:59 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7485
Sewer Name
B JOINT OUTFALL B - UNIT 8J
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_813373_TV15062_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
B 0778
Downstream MH
B 0777
Dir. of Survey
Downstream
Length Surveyed
278.9 ft.
Total Length
278.9 ft.
Structural Index
2
Structural Quick
3J2J
Structural Rating
269
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
379
Pipe schematic from manhole B 0778 to B 0777
MH: B 0778MH: B 0777downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07780 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start134.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN151.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN231.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN238 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES240 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN255.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN264.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN274.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish276 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish276 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish278.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE278.9 ft. AMH - Downstream Manhole, Survey Ends - B 0777

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

    238 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
2MGO65% MAG COAT
274.8SAV
151.4TFOPEN
276SSS
278.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
255.9TFOPEN
231.8TFOPEN
278.9AMHB 0777
264.5TFOPEN
238SAP
0MWM
0AMHB 0778
12.8SAV
134.4TFOPEN
0MWL
240TFOPEN
2DAGS
2SSS
276DAGS

Properties (6)

additional_info
SC398892
custom_field_two
3
customer
LACSD
datetime
2020-03-16T01:59:27-07:00
documentation
PROPIPE
is_lateral_inspection
false