Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 20, 2020, 09:12 AM
  • B 0768_B 0767 _03202020_032942.mp4

Date
03/20/2020
W/O
813373
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00112
PipeID
P09235
Time
2:12 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7486
Sewer Name
B JOINT OUTFALL B - UNIT 8J
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_813373_TV15062_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 0768
Downstream MH
B 0767
Dir. of Survey
Downstream
Length Surveyed
525.8 ft.
Total Length
525.8 ft.
Structural Index
3
Structural Quick
563T
Structural Rating
553
O&M Index
2
O&M Quick
2U00
O&M Rating
216
Overall Index
2
Overall Quick
Overall Rating
769
Pipe schematic from manhole B 0768 to B 0767
MH: B 0768MH: B 0767downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 07680 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. MGO - General Observation - 80% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start35.3 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish208.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN212 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - 25% GREASE-LATERAL/OPEN255.2 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - 25% GREASE-LATERAL/OPEN325.2 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - 15% GREASE-LATERAL/OPEN393.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN416 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"419.7 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - 30% GREASE-LATERAL/OPEN521.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN523 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish523 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish525.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish525.8 ft. AMH - Downstream Manhole, Survey Ends - B 0767

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
2MGO80% MAG COAT
0AMHB 0768
325.2TFD15% GREASE-LATERAL/OPEN
3.2SAP
419.7TFD30% GREASE-LATERAL/OPEN
521.9TFOPEN
523SSS
208.2TFOPEN
525.8SAP
212TFD25% GREASE-LATERAL/OPEN
35.3SRV
255.2TFD25% GREASE-LATERAL/OPEN
393.7TFOPEN
2SSS
0MWM
523DAGS
0MWL
2DAGS
3.2SRV
525.8AMHB 0767
416TFA
0MGOCONN @ MH 3 O'CLOCK/ACTIVE

Properties (6)

additional_info
SC398893
custom_field_two
3
customer
LACSD
datetime
2020-03-20T02:12:55-07:00
documentation
PROPIPE
is_lateral_inspection
false