Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 20, 2020, 04:54 AM
  • B 0775_B 0774 _03192020_221800.mp4

Date
03/19/2020
W/O
813373
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00112
PipeID
P09242
Time
9:54 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7486
Sewer Name
B JOINT OUTFALL B - UNIT 8J
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_813373_TV15062_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
B 0775
Downstream MH
B 0774
Dir. of Survey
Downstream
Length Surveyed
938.8 ft.
Total Length
938.8 ft.
Structural Index
3
Structural Quick
3d2d
Structural Rating
935
O&M Index
2
O&M Quick
2d00
O&M Rating
374
Overall Index
2
Overall Quick
Overall Rating
1309
Pipe schematic from manhole B 0775 to B 0774
MH: B 0775MH: B 0774downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07750 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - 75% MAG COAT936 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish936 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish938.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish938.8 ft. AMH - Downstream Manhole, Survey Ends - B 0774

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2.1SAP
936DAGS
2SSS
0MWM
938.8AMHB 0774
2.1MGO75% MAG COAT
938.7SAP
0AMHB 0775
2DAGS
936SSS
0MWL

Properties (6)

additional_info
SC398893
custom_field_two
3
customer
LACSD
datetime
2020-03-19T21:54:02-07:00
documentation
PROPIPE
is_lateral_inspection
false