Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 20, 2020, 07:05 AM
  • B 0772_B 0771 _03202020_011737.mp4

Date
03/20/2020
W/O
813373
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00112
PipeID
P09239
Time
12:05 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7486
Sewer Name
B JOINT OUTFALL B - UNIT 8J
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_813373_TV15062_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 0772
Downstream MH
B 0771
Dir. of Survey
Downstream
Length Surveyed
953.9 ft.
Total Length
953.9 ft.
Structural Index
2
Structural Quick
312e
Structural Rating
383
O&M Index
2
O&M Quick
2e11
O&M Rating
385
Overall Index
2
Overall Quick
Overall Rating
768
Pipe schematic from manhole B 0772 to B 0771
MH: B 0772MH: B 0771downstream0 ft. VC - Vermin Cockroach, within 8 inches of joint: NO - @ MH0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07720 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start13.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.2 ft. MGO - General Observation - 65% MAG COAT535 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN688.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN744.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN800.7 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - OPEN873 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4", 6" - 30% GREASE-LATERAL/OPEN904.9 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4", 6" - 20% GREASE-LATERAL/OPEN951 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish951 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish953.9 ft. AMH - Downstream Manhole, Survey Ends - B 0771953.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
0VC@ MH
13.2SAV
0MWM
0MWL
2SSS
2DAGS
0AMHB 0772
953.9AMHB 0771
535TFOPEN
951SSS
688.1TFOPEN
13.2MGO65% MAG COAT
873TFD30% GREASE-LATERAL/OPEN
953.9SAV
800.7TFOPEN
904.9TFD20% GREASE-LATERAL/OPEN
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
951DAGS
744.6TFOPEN

Properties (6)

additional_info
SC398893
custom_field_two
3
customer
LACSD
datetime
2020-03-20T00:05:24-07:00
documentation
PROPIPE
is_lateral_inspection
false