Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2020, 08:37 AM
  • 01 0445_01 0444_04012020_014523.mp4

Date
04/01/2020
W/O
818388
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00208
PipeID
P00927
Time
1:37 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7498
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_818388_TV01030_MAR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0444
Downstream MH
01 0445
Dir. of Survey
Upstream
Length Surveyed
193.1 ft.
Total Length
193.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 01 0444 to 01 0445
MH: 01 0444MH: 01 0445upstream0 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 01 04450 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish35.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"94.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"126.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"191 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start191 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start193.1 ft. MWM - Water Mark, 25 %of cross sectional area193.1 ft. MWL - Water Level, 15 %of cross sectional area193.1 ft. AMH - Downstream Manhole, Survey Begins - 01 0444

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
193.1MGOCONNECTION AT MH 12 O'CLOCK
2.1SSS
157.5TF
0MWM
66.3TF
99TF
0MWL
193.1SSS
2.1SAP
193.1AMH01 0445
0AMH01 0444
193.1SAP

Properties (6)

additional_info
SC411105
custom_field_two
3
customer
LACSD
datetime
2020-04-01T01:37:47-07:00
documentation
PROPIPE
is_lateral_inspection
false