Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2020, 08:16 AM
  • 01 0444_01 0443_04012020_013347.mp4

Date
04/01/2020
W/O
818388
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00208
PipeID
P00926
Time
1:16 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7498
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_818388_TV01030_MAR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0444
Downstream MH
01 0443
Dir. of Survey
Downstream
Length Surveyed
364.3 ft.
Total Length
364.3 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 01 0444 to 01 0443
MH: 01 0444MH: 01 0443downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 04440 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start96.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"147.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES177.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"183 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"198.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"212.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES234.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"271.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"308.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"314.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"329.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"355.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"364.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.3 ft. AMH - Downstream Manhole, Survey Ends - 01 0443

Observation photos (6)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    198.9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    226.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    329.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Downstream Manhole, Survey Ends - 01 0443

    364.3 ft. - Downstream Manhole, Survey Ends - 01 0443

Observations (26)

DistanceCodeObservation
152.6TFC
98.3TFC
314.4TF
271.2TF
364.3SAP
0AMH01 0444
177.5TFA
0MWM
329.9TB
226.1CM
183TFC
147.1TFC
96.3TF
2.1SAP
308.5TF
177.2DAGS
364.3SSS
234.4TF
198.9TB
355.8TFC
0MGOCONNECTION AT MH 9 O'CLOCK
0MGOCONNECTION AT MH 6 O'CLOCK
0MWL
364.3AMH01 0443
212.1TF
2.1SSS

Properties (6)

additional_info
SC411105
custom_field_two
3
customer
LACSD
datetime
2020-04-01T01:16:25-07:00
documentation
PROPIPE
is_lateral_inspection
false