01 0444_01 0443_04012020_013347.mp4
2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
198.9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"
226.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
329.9 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"
364.3 ft. - Downstream Manhole, Survey Ends - 01 0443
| Distance | Code | Observation |
|---|---|---|
| 152.6 | TFC | — |
| 98.3 | TFC | — |
| 314.4 | TF | — |
| 271.2 | TF | — |
| 364.3 | SAP | — |
| 0 | AMH | 01 0444 |
| 177.5 | TFA | — |
| 0 | MWM | — |
| 329.9 | TB | — |
| 226.1 | CM | — |
| 183 | TFC | — |
| 147.1 | TFC | — |
| 96.3 | TF | — |
| 2.1 | SAP | — |
| 308.5 | TF | — |
| 177.2 | DAGS | — |
| 364.3 | SSS | — |
| 234.4 | TF | — |
| 198.9 | TB | — |
| 355.8 | TFC | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 0 | MGO | CONNECTION AT MH 6 O'CLOCK |
| 0 | MWL | — |
| 364.3 | AMH | 01 0443 |
| 212.1 | TF | — |
| 2.1 | SSS | — |