Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2020, 07:14 AM
  • 01 0436A_01 0436_04012020_002928.mp4

Date
04/01/2020
W/O
818388
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00208
PipeID
P00919
Time
12:14 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7498
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_818388_TV01030_MAR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0436A
Downstream MH
01 0436
Dir. of Survey
Downstream
Length Surveyed
244 ft.
Total Length
244 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 01 0436A to 01 0436
MH: 01 0436AMH: 01 0436downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 0436A0 ft. MWL - Water Level, 15 %of cross sectional area3.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"24.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"27.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"61.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"73.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"80.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"102.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"107.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"126.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"127.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"153.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"171.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"244 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish244 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK244 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish244 ft. AMH - Downstream Manhole, Survey Ends - 01 0436244 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
244SAP
73.8TFC
244MGOCONNECTION AT MH 3 O'CLOCK
127.7TFC
162.4TFC
61.5TF
153.7TF
0MWM
27.5TFC
126.9TFC
24.2TF
244SSS
80.1TF
0AMH01 0436A
102.6TFC
9.8TFC
171.9TF
0MWL
51.2TFC
244AMH01 0436
3.1SAP
107.6TF
3.1SSS
244MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC411105
custom_field_two
3
customer
LACSD
datetime
2020-04-01T00:14:01-07:00
documentation
PROPIPE
is_lateral_inspection
false