Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 2, 2020, 06:19 AM
  • 01 0419_01 0418A_04012020_233821.mp4

Date
04/01/2020
W/O
818388
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00208
PipeID
P00900
Time
11:19 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7500
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_818388_TV01030_MAR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0419
Downstream MH
01 0418A
Dir. of Survey
Downstream
Length Surveyed
165.4 ft.
Total Length
165.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 01 0419 to 01 0418A
MH: 01 0419MH: 01 0418Adownstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 04190 ft. MWM - Water Mark, 5 %of cross sectional area5.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"49.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"67.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"96 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"121 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"165.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish165.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK165.4 ft. AMH - Downstream Manhole, Survey Ends - 01 0418A165.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
5.7SSS
0MWL
44.9TFC
123.6TFC
165.4SAP
70.2TF
49.6TFC
128.7TF
165.4MGOCONNECTION AT MH 9 O'CLOCK
96TF
0MGOCONNECTION AT MH 3 O'CLOCK
165.4AMH01 0418A
121TFC
5.6SAP
67.7TFC
165.4SSS
0AMH01 0419
146.4TF
0MWM

Properties (6)

additional_info
SC411107
custom_field_two
3
customer
LACSD
datetime
2020-04-01T23:19:06-07:00
documentation
PROPIPE
is_lateral_inspection
false