Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 23, 2020, 08:05 AM
  • 20 0229_20 0228_03232020_012614.mp4

Date
03/23/2020
W/O
818455
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00735
PipeID
P19196
Time
1:05 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7449
Sewer Name
20 AVENUE "Q" TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_818455_TV20019_MAR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0228
Downstream MH
20 0229
Dir. of Survey
Upstream
Length Surveyed
336.8 ft.
Total Length
336.8 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
2M00
O&M Rating
136
Overall Index
2
Overall Quick
Overall Rating
471
Pipe schematic from manhole 20 0228 to 20 0229
MH: 20 0228MH: 20 0229upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 02291.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish25.8 ft. MGO - General Observation - VERMIN (3 RATS)41.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"45 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"94 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"97.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"143.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"192.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"195.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"244.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"293.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"296.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"327.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"334.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start334.8 ft. MGO - General Observation - 70% MAG COAT THROUGHOUT334.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS334.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start334.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start336.8 ft. MWM - Water Mark, 15 %of cross sectional area336.8 ft. AMH - Downstream Manhole, Survey Begins - 20 0228336.8 ft. MWL - Water Level, 10 %of cross sectional area336.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE

Observation photos (3)

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIS

    2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (28)

DistanceCodeObservation
2SSS
291.8TFC
2MGO70% MAG COAT THROUGHOUT
295.3TFC
9.6TFC
43.3TFC
0MWM
193.6TFC
95.4TFC
0AMH20 0228
239.6TFC
141.7TFC
2DSZDEBRIS
242.8TFC
196.7TFC
335.4SSS
2SAP
92.6TFC
335.4SAP
311MGOVERMIN (3 RATS)
2DAGS
335.4DAGS
40.2TFC
336.8AMH20 0229
12.3TFC
0MWL
144.5TFC
0MGOCONN @ MH 9 O'CLOCK/ACTIVE

Properties (6)

additional_info
SC398839
custom_field_two
3
customer
LACSD
datetime
2020-03-23T01:05:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false