Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 24, 2020, 07:02 AM
  • 20 0216_20 0215_03242020_001647.mp4

Date
03/24/2020
W/O
818455
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00735
PipeID
P19183
Time
12:02 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7450
Sewer Name
20 AVENUE "Q" TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_818455_TV20019_MAR2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0216
Downstream MH
20 0215
Dir. of Survey
Downstream
Length Surveyed
326.1 ft.
Total Length
326.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole 20 0216 to 20 0215
MH: 20 0216MH: 20 0215downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02162 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 60% MAG COAT THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED72.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"75.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"125.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"171.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"174.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"223.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"275.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish323.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish323.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish324 ft. MGO - General Observation - PEELING AND FLAKING THROUGHOUT326.1 ft. AMH - Downstream Manhole, Survey Ends - 20 0215

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
323.9SAP
272.4TFC
2DAGS
223.4TFC
323.9DAGS
2SSS
0MWM
171.3TFC
0MWL
122.1TFC
2MGO60% MAG COAT THROUGHOUT
0AMH20 0216
275.6TFC
2SAP
125.3TFC
323.9SSS
72.7TFC
326.1AMH20 0215
2MGOCONN @ MH 9 O'CLOCK/CAPPED
226.7TFC
324MGOPEELING AND FLAKING THROUGHOUT
174.4TFC
75.8TFC

Properties (6)

additional_info
SC398840
custom_field_two
3
customer
LACSD
datetime
2020-03-24T00:02:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false