Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2020, 06:09 AM
  • 14 0552_14 0551 _03162020_232718.mp4

Date
03/16/2020
W/O
813897
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18646
Time
11:09 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7442
Sewer Name
14 35TH STREET WEST TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_813897_TV14042_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0552
Downstream MH
14 0551
Dir. of Survey
Downstream
Length Surveyed
553.9 ft.
Total Length
553.9 ft.
Structural Index
3
Structural Quick
5U3U
Structural Rating
1100
O&M Index
2
O&M Quick
2U00
O&M Rating
220
Overall Index
3
Overall Quick
Overall Rating
1320
Pipe schematic from manhole 14 0552 to 14 0551
MH: 14 0552MH: 14 0551downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05520 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG COAT2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start551 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish551 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG COAT552.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish552.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish552.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish553.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0551

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
2DAGS
2SZ70% MAG COAT
0MWL
2SRV
552.7SSS
0MWM
552.7DAGS
0AMH14 0552
2SAP
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
553.9AMH14 0551
2SSS
551SRV
552.7SAP
551SZ70% MAG COAT

Properties (6)

additional_info
SC398832
custom_field_two
3
customer
LACSD
datetime
2020-03-16T23:09:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false