Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 19, 2020, 06:04 AM
  • 14 0550_14 0549 _03182020_232452.mp4

Date
03/18/2020
W/O
813897
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18643
Time
11:04 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7445
Sewer Name
14 35TH STREET WEST TRUNK
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_813897_TV14042_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0550
Downstream MH
14 0549
Dir. of Survey
Downstream
Length Surveyed
547.5 ft.
Total Length
547.5 ft.
Structural Index
3
Structural Quick
5U3U
Structural Rating
1090
O&M Index
2
O&M Quick
2U00
O&M Rating
218
Overall Index
3
Overall Quick
Overall Rating
1308
Pipe schematic from manhole 14 0550 to 14 0549
MH: 14 0550MH: 14 0549downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05500 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG COAT2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start545 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish545 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 75% MAG COAT545.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish545.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish545.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish547.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0549

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWL
0AMH14 0550
545.4SAP
2SAP
2SZ75% MAG COAT
545.5SSS
2SRV
545SRV
2SSS
0MWM
545.5DAGS
547.5AMH14 0549
2DAGS
545SZ75% MAG COAT

Properties (6)

additional_info
SC398835
custom_field_two
3
customer
LACSD
datetime
2020-03-18T23:04:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false