Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 19, 2020, 07:32 AM
  • 14 0546_14 0545 _03192020_004449.mp4

Date
03/19/2020
W/O
813897
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18637
Time
12:32 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7445
Sewer Name
14 35TH STREET WEST TRUNK
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_813897_TV14042_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0546
Downstream MH
14 0545
Dir. of Survey
Downstream
Length Surveyed
312.7 ft.
Total Length
312.7 ft.
Structural Index
3
Structural Quick
5K3K
Structural Rating
620
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
744
Pipe schematic from manhole 14 0546 to 14 0545
MH: 14 0546MH: 14 0545downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05462 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG COAT2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start309.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 75% MAG COAT310 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish312.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0545

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2SZ75% MAG COAT
0MWM
310SZ75% MAG COAT
309.9DAGS
0MWL
0AMH14 0546
2SRV
309.9SSS
2SSS
2SAP
309.9SAP
310SRV
312.7AMH14 0545
2DAGS

Properties (6)

additional_info
SC398835
custom_field_two
3
customer
LACSD
datetime
2020-03-19T00:32:05-07:00
documentation
PRO PIPE
is_lateral_inspection
false