Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 19, 2020, 08:37 AM
  • 14 0543_14 0542 _03192020_015034.mp4

Date
03/19/2020
W/O
813897
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00588
PipeID
P18634
Time
1:37 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7445
Sewer Name
14 35TH STREET WEST TRUNK
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_813897_TV14042_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0543
Downstream MH
14 0542
Dir. of Survey
Downstream
Length Surveyed
321.3 ft.
Total Length
321.3 ft.
Structural Index
3
Structural Quick
5L3L
Structural Rating
630
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
3
Overall Quick
Overall Rating
758
Pipe schematic from manhole 14 0543 to 14 0542
MH: 14 0543MH: 14 0542downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05430 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start319 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG COAT319.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish319.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0542

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWL
2SZ65% MAG COAT
319SRV
319.7SSS
6.4SAP
319.7DAGS
2DAGS
0AMH14 0543
0MWM
319.7SAP
2SRV
321.3AMH14 0542
4.5SSS
319SZ65% MAG COAT

Properties (6)

additional_info
SC398835
custom_field_two
3
customer
LACSD
datetime
2020-03-19T01:37:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false