Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 4, 2020, 09:48 AM
  • 20 0127_20 0126A _03042020_025918.mp4

Date
03/04/2020
W/O
813500
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P22286
Time
1:48 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7427
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_813500_TV20027_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0127
Downstream MH
20 0126A
Dir. of Survey
Downstream
Length Surveyed
156.9 ft.
Total Length
156.9 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
150
O&M Index
2
O&M Quick
3C2E
O&M Rating
114
Overall Index
2
Overall Quick
Overall Rating
264
Pipe schematic from manhole 20 0127 to 20 0126A
MH: 20 0127MH: 20 0126Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01270 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"10.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"24.9 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start104.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"108 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"115.7 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish154.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish154.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish154.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish156.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK156.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0126A

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    24.9 ft. - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
156.9MGOCONNECTION AT MH 3 O'CLOCK
0MWL
0AMH20 0127
115.7DSF
2SAP
104.1TFC
154.5SSS
2SSS
24.9DSF
10.9TFC
0MWM
108TFC
6.5TFC
154.5SAP
156.9AMH20 0126A
2DAGS
154.5DAGS

Properties (7)

additional_info
SC398816
custom_field_three
SPPALING /AGGREGATE PROJECTING
custom_field_two
3
customer
LACSD
datetime
2020-03-04T01:48:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false