Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 4, 2020, 10:13 AM
  • 20 0125_20 0124 _03042020_032727.mp4

Date
03/04/2020
W/O
813500
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19048
Time
2:13 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7427
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_813500_TV20027_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0125
Downstream MH
20 0124
Dir. of Survey
Downstream
Length Surveyed
380.1 ft.
Total Length
380.1 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 20 0125 to 20 0124
MH: 20 0125MH: 20 0124downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01250 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"19.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"24.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"217.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"318.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"378.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish378.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish378.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish380.1 ft. AMH - Downstream Manhole, Survey Ends - 20 0124

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
323.3TFC
378.9DAGS
217.6TFC
378.9SAP
124.3TFC
24.8TBA
19.8TFC
120.5TFC
318.8TFC
2SSS
0AMH20 0125
0MWM
380.1AMH20 0124
15.1TFC
221.6TFC
2DAGS
0MWL
378.9SSS
2SAP

Properties (7)

additional_info
SC398816
custom_field_three
SPALLING/AGGREGATE PROJECTING
custom_field_two
2
customer
LACSD
datetime
2020-03-04T02:13:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false