Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 5, 2020, 05:53 AM
  • 20 0121_20 0120 _03042020_231544.mp4

Date
03/04/2020
W/O
813500
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00744
PipeID
P19044
Time
9:53 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7428
Sewer Name
20 TRUNK "C"
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_813500_TV20027_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0121
Downstream MH
20 0120
Dir. of Survey
Downstream
Length Surveyed
380.2 ft.
Total Length
380.2 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
2
O&M Quick
2\00
O&M Rating
286
Overall Index
2
Overall Quick
Overall Rating
661
Pipe schematic from manhole 20 0121 to 20 0120
MH: 20 0121MH: 20 0120downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01210 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start39 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS75.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"79.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"278.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"282.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"332.3 ft. MWL - Water Level, 40 %of cross sectional area367 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"371.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"378.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish378.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish378.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish378.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish380.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0120

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    39 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (21)

DistanceCodeObservation
282.5TFC
39DSZDEBRIS
2SAP
180.9TFC
378.2DAGS
177TFC
79.7TFC
278.1TFC
0AMH20 0121
75.8TFC
2SSS
0MWL
371.6TFC
380.2AMH20 0120
2DAGS
367TFC
332.3MWL
378.2SAP
0MWM
378.2DSZ
378.2SSS

Properties (7)

additional_info
SC398817
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
LACSD
datetime
2020-03-04T21:53:54-08:00
documentation
PRO PIPE
is_lateral_inspection
false