Wastewater/Activity/PacpInspection/1.0Mar 10, 2020, 07:27 AM
  • 14 0469_14 0468 _03102020_004149.mp4

Date
03/10/2020
W/O
813451
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00580
PipeID
P18558
Time
12:27 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7435
Sewer Name
14 TRUNK "D"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_813451_TV14023_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0468
Downstream MH
14 0469
Dir. of Survey
Upstream
Length Surveyed
340.2 ft.
Total Length
340.2 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
338
Pipe schematic from manhole 14 0468 to 14 0469
MH: 14 0468MH: 14 0469upstream0 ft. AMH - Upstream Manhole, Survey Ends - 14 04692 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish11.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"27.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"55.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"79.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"103.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.1 ft. OBM - Obstacles Pipe Material, 15 %of cross sectional area, from 05 to 07 o'clock127.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"156.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"278.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"294.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"324.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"338.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start338.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start340.2 ft. MWL - Water Level, 5 %of cross sectional area340.2 ft. MWM - Water Mark, 5 %of cross sectional area340.2 ft. AMH - Downstream Manhole, Survey Begins - 14 0468

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Pipe Material, 15 %of cross sectional area, from 05 to 07 o'clock

    231.1 ft. - Obstacles Pipe Material, 15 %of cross sectional area, from 05 to 07 o'clock

Observations (23)

DistanceCodeObservation
62.1TFC
86TFC
2SSS
135TFC
183.8TFC
231.1OBM
212.3TFC
110.9TFC
45.7TFC
236.6TFC
163.5TFC
2SAP
329TFC
0MWL
340.2AMH14 0469
16.1TFC
0MWM
260.9TFC
0AMH14 0468
338.2SAP
285.1TFC
313TFC
338.2SSS

Properties (6)

additional_info
SC398825
custom_field_two
2
customer
LACSD
datetime
2020-03-10T00:27:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false