Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 27, 2020, 08:28 AM
  • J 0265_J 0264 _02272020_013739.mp4

Date
02/27/2020
W/O
813409
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00059
PipeID
P11504
Time
12:28 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7467
Sewer Name
J JOINT OUTFALL J - UNIT 1G
City
RANCHO PALOS VERDES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
46
Purpose
Routine Assessment
Project
RFIR_WO_813409_TV05169_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
J 0265
Downstream MH
J 0264
Dir. of Survey
Downstream
Length Surveyed
139 ft.
Total Length
139 ft.
Structural Index
4
Structural Quick
5141
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
14
Pipe schematic from manhole J 0265 to J 0264
MH: J 0265MH: J 0264downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 02650 ft. MWL - Water Level, 10 %of cross sectional area4.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start91.8 ft. SRV - Surface Reinforcement Visible, from 08 to 03 o'clock, within 8 inches of joint: YES, Start138.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish139 ft. SRV - Surface Reinforcement Visible, from 08 to 03 o'clock, within 8 inches of joint: YES, Finish139 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish139 ft. MSA - Survey Abandoned - CAM GOING UNDERWATER139 ft. MWLS - Water Level, Sag in pipe, 75 %of cross sectional area

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 03 o'clock, within 8 inches of joint: YES, Start

    91.8 ft. - Surface Reinforcement Visible, from 08 to 03 o'clock, within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 75 %of cross sectional area

    139 ft. - Water Level, Sag in pipe, 75 %of cross sectional area

Observations (11)

DistanceCodeObservation
139SRV
91.8SRV
138.9SAP
4.4SAP
4.4SSS
139SSS
139MSACAM GOING UNDERWATER
139MWLS
0MWM
0AMHJ 0265
0MWL

Properties (6)

additional_info
SC398872
custom_field_two
2
customer
LACSD
datetime
2020-02-27T00:28:58-08:00
documentation
PROPIPE
is_lateral_inspection
false