Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 24, 2020, 11:13 AM
  • J 0312_J 0311_02242020_041734.mp4

Date
02/24/2020
W/O
813409
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00059
PipeID
P11553
Time
3:13 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7464
Sewer Name
J JOINT OUTFALL J - UNIT 1G
City
RANCHO PALOS VERDES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
41
Purpose
Routine Assessment
Project
RFIR_WO_813409_TV05169_FEB2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
J 0312
Downstream MH
J 0311
Dir. of Survey
Downstream
Length Surveyed
57.2 ft.
Total Length
57.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole J 0312 to J 0311
MH: J 0312MH: J 0311downstream0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 03120 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2.6 ft. MGO - General Observation - MAG COAT2.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start57.2 ft. AMH - Downstream Manhole, Survey Ends - J 031157.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK57.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
57.2AMHJ 0311
0MWM
0AMHJ 0312
0MWL
0MGOCONNECTION AT MH 9 O'CLOCK
2.6MGOMAG COAT
2.6SAV
57.2MGOCONNECTION AT MH 9 O'CLOCK
57.2SAV

Properties (6)

additional_info
SC398869
custom_field_two
3
customer
LACSD
datetime
2020-02-24T03:13:30-08:00
documentation
PROPIPE
is_lateral_inspection
false