Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2020, 08:00 AM
  • 15 0763_15 0762 _03032020_012231.mp4

Date
03/03/2020
W/O
813447
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00593
PipeID
P12964
Time
12:00 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7363
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_813447_TV15146_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0763
Downstream MH
15 0762
Dir. of Survey
Downstream
Length Surveyed
324 ft.
Total Length
324 ft.
Structural Index
2
Structural Quick
3L2L
Structural Rating
319
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
319
Pipe schematic from manhole 15 0763 to 15 0762
MH: 15 0763MH: 15 0762downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTIONS AT BOTH 3 AND 9 O'CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 15 07630 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.5 ft. JSM - Joint Separated Medium103.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"106.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"167.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"167.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"170.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"240.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"243.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"244.7 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 8"246.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"284.5 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 8"292.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"321.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish324 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK324 ft. AMH - Downstream Manhole, Survey Ends - 15 0762

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Joint Separated Medium

    5.5 ft. - Joint Separated Medium

Observations (22)

DistanceCodeObservation
103.5TF
324MGOCONNECTION AT MH 3 O'CLOCK
243.6TFC
106.9TF
240.6TFC
324AMH15 0762
246.6TB
0MWL
5.5SSS
284.5TB
5.5JSM
292.5TF
321.1SAV
170.2TFC
0MGOCONNECTIONS AT BOTH 3 AND 9 O'CLOCK AT MH
321.1SSS
0AMH15 0763
0MWM
167.2TF
244.7TB
2SAV
167.2TB

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-03-03T00:00:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false