Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2020, 10:13 AM
  • 15 0757_15 0756 _03032020_033030.mp4

Date
03/03/2020
W/O
813447
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00593
PipeID
P12957
Time
2:13 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7363
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_813447_TV15146_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0757
Downstream MH
15 0756
Dir. of Survey
Downstream
Length Surveyed
331.5 ft.
Total Length
331.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
325
Pipe schematic from manhole 15 0757 to 15 0756
MH: 15 0757MH: 15 0756downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07570 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start64.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"68.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"76.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"136 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"141.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"151.6 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 8"198.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"202.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"229.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"283.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"327.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish331.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK331.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0756

Observation photos (2)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
2SSS
0MWL
327.9SAV
283.7TB
2SAV
202.8TB
64.5TB
141.7TFC
331.5MGOCONNECTION AT MH 3 O'CLOCK
198.4TFC
327.9SSS
76.5TB
0AMH15 0757
0MWM
331.5AMH15 0756
151.6TB
136TF
68.5TFC
229.3TF

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-03-03T02:13:02-08:00
documentation
PRO PIPE
is_lateral_inspection
false