15 0771_15 0770 _02192020_021303.mp4
0 ft. - Upstream Manhole, Survey Begins - 15 0771
2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
5.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
26.9 ft. - Roots Medium Joint, from 01 to 02 o'clock, 10 %, within 8 inches of joint: YESR
99.1 ft. - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YES
117.5 ft. - Roots Fine Joint, from 12 to 02 o'clock, within 8 inches of joint: YES
126.3 ft. - Roots Fine Joint, at 01 o'clock, within 8 inches of joint: YES
161.3 ft. - Roots Medium Lateral, at 02 o'clock, 15 %, within 8 inches of joint: YES
162.7 ft. - Roots Medium Joint, from 08 to 10 o'clock, 20 %, within 8 inches of joint: YESR
226.5 ft. - Roots Fine Joint, from 12 to 03 o'clock, within 8 inches of joint: YES
229.3 ft. - Roots Medium Joint, from 08 to 04 o'clock, 15 %, within 8 inches of joint: YESR, Start
279.5 ft. - Roots Medium Lateral, from 04 to 08 o'clock, 20 %, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 279.5 | TF | — |
| 162.7 | RMJ | — |
| 99.1 | RFJ | — |
| 299.1 | RMJ | — |
| 340.2 | TFC | — |
| 396.5 | DAGS | — |
| 103.8 | RFL | — |
| 161.3 | RML | — |
| 396.4 | SSS | — |
| 226.5 | RFJ | — |
| 2.2 | DAGS | — |
| 2.2 | SAV | — |
| 106.8 | TF | — |
| 26.9 | RMJ | — |
| 309.5 | TB | — |
| 5.9 | SSS | — |
| 399.1 | AMH | 15 0770 |
| 92.3 | TB | — |
| 161.3 | TF | — |
| 0 | MGO | CONNECTION AT MH 3 OCLOCK & 9 OCLOCK |
| 279.5 | RML | — |
| 126.3 | RFJ | — |
| 103.8 | TF | — |
| 0 | MWM | — |
| 396.4 | SAV | — |
| 56.6 | TB | — |
| 336.7 | TFC | — |
| 158.3 | TF | — |
| 276.2 | TFC | — |
| 399.1 | MGO | CONNECTION AT MH 3 OCLOCK & 9 OCLOCK |
| 117.5 | RFJ | — |
| 0 | AMH | 15 0771 |
| 229.3 | RMJ | — |