Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 19, 2020, 11:05 AM
  • 15 0769_15 0768 _02192020_041742.mp4

Date
02/19/2020
W/O
813447
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00593
PipeID
P12970
Time
3:05 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7360
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_813447_TV15146_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0769
Downstream MH
15 0768
Dir. of Survey
Downstream
Length Surveyed
201.2 ft.
Total Length
201.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 15 0769 to 15 0768
MH: 15 0769MH: 15 0768downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 07690 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"96.7 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"160.8 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"197.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish197.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish197.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish201.2 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK201.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0768

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 OCLOCK
21.6TFC
201.2MGOCONNECTION AT MH 3 OCLOCK
0MWM
96.7TB
5.2SSS
160.8TB
197.5SSS
201.2AMH15 0768
0AMH15 0769
0MWL
2SAV
197.5SAV
2DAGS
197.5DAGS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-02-19T03:05:55-08:00
documentation
PRO PIPE
is_lateral_inspection
false