Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 19, 2020, 11:20 AM
  • 15 0768_15 0767 _02192020_043544.mp4

Date
02/19/2020
W/O
813447
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00593
PipeID
P12969
Time
3:20 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7360
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_813447_TV15146_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0768
Downstream MH
15 0767
Dir. of Survey
Downstream
Length Surveyed
198.2 ft.
Total Length
198.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4123
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 15 0768 to 15 0767
MH: 15 0768MH: 15 0767downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 07682 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start73.6 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: YES, 6"73.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"112.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"115.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"116.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start167.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Finish182.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start195.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish195.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish195.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish195.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Finish198.2 ft. AMH - Downstream Manhole, Survey Ends - 15 0767198.2 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK & 9 OCLOCK

Observation photos (5)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock,  , within 8 inches of joint: YES, Start

    116.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock,  , within 8 inches of joint: YES, Start

    182.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
112.9TF
198.2AMH15 0767
73.6TB
0MWM
0MWL
0MGOCONNECTION AT MH 3 OCLOCK
2SAV
167.8DAE
195.7SAV
116.1DAE
195.7DAGS
195.7SSS
0AMH15 0768
73.8TB
195.7DAE
2SSS
182.9DAE
115.7TF
2DAGS
198.2MGOCONNECTION AT MH 3 OCLOCK & 9 OCLOCK

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-02-19T03:20:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false