Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 6, 2020, 07:41 AM
  • 20 0192_20 0191_03062020_010420.mp4

Date
03/05/2020
W/O
813482
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19116
Time
11:41 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7429
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_813482_TV20021_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0192
Downstream MH
20 0191
Dir. of Survey
Downstream
Length Surveyed
395 ft.
Total Length
395 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
2
O&M Quick
2P00
O&M Rating
168
Overall Index
2
Overall Quick
Overall Rating
558
Pipe schematic from manhole 20 0192 to 20 0191
MH: 20 0192MH: 20 0191downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01922 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"31 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"79.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"132 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"181.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"230.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"233 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS267.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish278.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"282 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"331.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"333.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"381 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"382.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"394 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish394 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish394 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish395 ft. AMH - Downstream Manhole, Survey Ends - 20 0191395 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    238.8 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (29)

DistanceCodeObservation
79.2TFC
0MWL
395AMH20 0191
395MGOCONNECTION AT MH 3 O'CLOCK
2SSS
331.1TFC
238.8DSZDEBRIS
382.8TFC
2DAGS
381TFC
282TFC
128.3TFC
233TFC
0MWM
31TFC
333.7TFC
394SAP
28TFC
394SSS
230.1TFC
0AMH20 0192
132TFC
278.6TFC
267.8DSZ
177.3TFC
181.1TFC
2SAP
82.8TBA
394DAGS

Properties (6)

additional_info
SC398818
custom_field_two
2
customer
LACSD
datetime
2020-03-05T23:41:57-08:00
documentation
PRO PIPE
is_lateral_inspection
false