Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 10, 2020, 05:23 AM
  • 20 0194_20 0193_03092020_224038.mp4

Date
03/09/2020
W/O
813364
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19118
Time
10:23 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7434
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_813364_TV20060_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0194
Downstream MH
20 0193
Dir. of Survey
Downstream
Length Surveyed
459.8 ft.
Total Length
459.8 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
455
O&M Index
2
O&M Quick
2Q00
O&M Rating
182
Overall Index
2
Overall Quick
Overall Rating
637
Pipe schematic from manhole 20 0194 to 20 0193
MH: 20 0194MH: 20 0193downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 20 01942 ft. MGO - General Observation - 90% MAG COAT THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start64.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN66.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"115.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"167.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"213 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN217.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN217.2 ft. RPZD - Repair Other Defective, within 8 inches of joint: YES - LINER/FIBERGLASS PATCH265.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"268.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN314.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"317.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"367.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"370 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN422.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"425.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"457.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish457.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish457.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish458 ft. MGO - General Observation - CONN 3 O'CLOCK @ MH/ACTIVE459 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE459.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0193

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - 90% MAG COAT THROUGHOUT

    2 ft. - General Observation - 90% MAG COAT THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (31)

DistanceCodeObservation
167.5TFC
2MGO90% MAG COAT THROUGHOUT
422.4TFC
2SAP
314.8TFC
457.7SAP
317.5TFC
457.7DAGS
425.8TFC
217.2TBOPEN
367.4TFC
2SSS
370TFOPEN
268.9TFOPEN
0MWM
115.9TFC
0MWL
265.9TFC
459MGOCONN 9 O'CLOCK @ MH/ACTIVE
2DAGS
213TFUNKNOWN
0MGOCOCKROACHES IN MANHOLE
119.2TFC
164.5TFC
459.8AMH20 0193
457.7SSS
66.8TFC
0AMH20 0194
217.2RPZDLINER/FIBERGLASS PATCH
458MGOCONN 3 O'CLOCK @ MH/ACTIVE
64.3TFOPEN

Properties (6)

additional_info
SC398824
custom_field_two
2
customer
LACSD
datetime
2020-03-09T22:23:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false