Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 10, 2020, 04:47 AM
  • 20 0191_20 0190_03092020_220943.mp4

Date
03/09/2020
W/O
813364
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19115
Time
9:47 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7434
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_813364_TV20060_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
20 0191
Downstream MH
20 0190
Dir. of Survey
Downstream
Length Surveyed
487.8 ft.
Total Length
487.8 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
485
O&M Index
2
O&M Quick
2U00
O&M Rating
216
Overall Index
2
Overall Quick
Overall Rating
701
Pipe schematic from manhole 20 0191 to 20 0190
MH: 20 0191MH: 20 0190downstream0 ft. MGO - General Observation - CONN 3 O'CLOCK @ MH/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 20 01910 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start32.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"35.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"136.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"185.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"188.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"235.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"237.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"282.7 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN286.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"335 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"338.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"384.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"387.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"435.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"438.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"440.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS485.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish485.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish485.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, at 03 o'clock, , within 8 inches of joint: YES485.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish485.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish487 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE487 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE487.1 ft. MGO - General Observation - ROACHES @ MH487.8 ft. AMH - Downstream Manhole, Survey Ends - 20 0190

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, at 03 o'clock,  , within 8 inches of joint: YES

    485.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, at 03 o'clock, , within 8 inches of joint: YES

  • General Observation - CONN 9 O'CLOCK @ MH/ACTIVE

    487 ft. - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE

Observations (35)

DistanceCodeObservation
0MGOCONN 3 O'CLOCK @ MH/ACTIVE
0AMH20 0191
485.8DAGS
88.2TFC
86.3TFC
487.1MGOROACHES @ MH
2SSS
485.8SAP
487MGOCONN 9 O'CLOCK @ MH/ACTIVE
235.6TFC
487MGOCONN 9 O'CLOCK @ MH/ACTIVE
185.1TFC
35.7TFC
485.8DAGS
335TFC
2SAP
2DAGS
282.7TFDOPEN
387.7TFC
338.1TFC
440.4DSZDEBRIS
32.3TFC
133.9TFC
438.1TFC
237.3TFC
485.8DSZ
485.8SSS
0MWM
286.2TFC
0MWL
487.8AMH20 0190
435.4TFC
188.2TFC
136.5TFC
384.2TFC

Properties (6)

additional_info
SC398824
custom_field_two
2
customer
LACSD
datetime
2020-03-09T21:47:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false