Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 6, 2020, 11:33 AM
  • 20 0190_20 0189_03062020_044655.mp4

Date
03/06/2020
W/O
813364
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00739
PipeID
P19114
Time
3:33 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7432
Sewer Name
20 OUTFALL TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_813364_TV20060_FEB2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
20 0189
Downstream MH
20 0190
Dir. of Survey
Upstream
Length Surveyed
354 ft.
Total Length
354 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
350
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
490
Pipe schematic from manhole 20 0189 to 20 0190
MH: 20 0189MH: 20 0190upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01901 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE1 ft. MGO - General Observation - ROACHES @ MH1 ft. MGO - General Observation - CONN 3 OCLOCK @ MH/CAPPED1.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish49.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"52.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"147.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"199.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"251.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"301.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"304.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"352 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start352 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start352 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start352 ft. MGO - General Observation - 70% MAG COAT THROUGHOUT354 ft. AMH - Downstream Manhole, Survey Begins - 20 0189354 ft. MWM - Water Mark, 25 %of cross sectional area354 ft. MWL - Water Level, 20 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
353MGOCONN 9 O'CLOCK @ MH/ACTIVE
206.7TFC
304.8TFC
253.1TFC
256.5TFC
0AMH20 0189
2SAP
352.9DAGS
2DAGS
2SSS
0MWM
102.4TFC
151.7TFC
352.9SAP
49.8TFC
52.9TFC
353MGOROACHES @ MH
354AMH20 0190
0MWL
99.4TFC
352.9SSS
353MGOCONN 3 OCLOCK @ MH/CAPPED
2MGO70% MAG COAT THROUGHOUT
154.7TFC
301.9TFC
203.8TFC

Properties (6)

additional_info
SC398822
custom_field_two
2
customer
LACSD
datetime
2020-03-06T03:33:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false