Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2020, 08:37 PM
  • 29 0191_29 0190 _02052020_141432.mp4

Date
02/05/2020
W/O
813501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01025
PipeID
P24088
Time
12:37 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7351
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_813501_TV29101_FEB2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0190
Downstream MH
29 0191
Dir. of Survey
Upstream
Length Surveyed
286 ft.
Total Length
286 ft.
Structural Index
3
Structural Quick
3D21
Structural Rating
71
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
183
Pipe schematic from manhole 29 0190 to 29 0191
MH: 29 0190MH: 29 0191upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 01912.9 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - Throughout the reach48.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"51.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"76.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"97.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"101 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"149.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"152.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"164 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish198.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"202 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"213.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"255 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"274.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start277.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES284 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start286 ft. AMH - Downstream Manhole, Survey Begins - 29 0190286 ft. MWM - Water Mark, 20 %of cross sectional area286 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    8.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
31TFC
283.1DAGS
209.5TFC
188.2TFC
0AMH29 0190
234.6TF
133.1TF
185TF
11.6CM
72.3TF
84TFC
87.4TF
237.3TFC
0MWM
286AMH29 0191
283SSSThroughout the reach
0MWL
2DAGS
8.5CM
122CM
136.2TF

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2020-02-05T12:37:06-08:00
documentation
PRO PIPE
is_lateral_inspection
false