Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 21, 2020, 08:51 AM
  • 01 1127_01 1126_02212020_020513.mp4

Date
02/21/2020
W/O
813509
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00210
PipeID
P01979
Time
12:51 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7462
Sewer Name
01 HUNTINGTON PARK TRUNK
City
CUDAHY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_813509_TV01246_FEB2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1127
Downstream MH
01 1126
Dir. of Survey
Downstream
Length Surveyed
287.3 ft.
Total Length
287.3 ft.
Structural Index
3
Structural Quick
3J21
Structural Rating
173
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
175
Pipe schematic from manhole 01 1127 to 01 1126
MH: 01 1127MH: 01 1126downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 11270.5 ft. MWM - Water Mark, 10 %of cross sectional area2.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"74.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"112.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"154.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"163.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"201.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"246.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"256.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"284.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"287 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - Throughout the reach287 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - Throughout the reach287.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish287.3 ft. AMH - Downstream Manhole, Survey Ends - 01 1126

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
256.6TF
284.8TF
287.3AMH01 1126
2.9CM
0MGOCONNECTION AT MH 9 O'CLOCK
74.2TF
287SSSThroughout the reach
287DAGSThroughout the reach
0.5MWM
246.8TF
122.5TF
0MWL
163.5TF
71.3TF
21.9TF
0MGOCONNECTION AT MH 3 O'CLOCK
189.7TF
287.2CM
0AMH01 1127
201.5TF
112.8TF
154.2TF

Properties (6)

additional_info
SC398867
custom_field_two
3
customer
LACSD
datetime
2020-02-21T00:51:04-08:00
documentation
PROPIPE
is_lateral_inspection
false