Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 21, 2020, 10:11 AM
  • 01 1369_01 0795_02212020_032003.mp4

Date
02/21/2020
W/O
813501
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00197
PipeID
P01498
Time
2:11 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7463
Sewer Name
01 BULLIS ROAD-TEMPLE STREET TRUNK
City
LYNWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_813502_TV01264_FEB2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1369
Downstream MH
01 0795
Dir. of Survey
Downstream
Length Surveyed
133.4 ft.
Total Length
133.4 ft.
Structural Index
3
Structural Quick
3G21
Structural Rating
122
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
128
Pipe schematic from manhole 01 1369 to 01 0795
MH: 01 1369MH: 01 0795downstream0 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 13690 ft. MWL - Water Level, 20 %of cross sectional area2.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start6.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"19.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish19.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start55.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"55.6 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start79.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"106.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"131 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - Throughout the reach131 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES - Throughout the reach131.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish133.4 ft. AMH - Downstream Manhole, Survey Ends - 01 0795133.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    19.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    55.6 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
106.8TFC
19.5FL
0MWM
133.4AMH01 0795
19.5CM
131SSSThroughout the reach
55.3TF
131.2CM
133.4FL
0AMH01 1369
6.3TF
2.1FL
0MWL
79.4TFC
55.6FL
131DAGSThroughout the reach
127.5TFC

Properties (6)

additional_info
SC398868
custom_field_two
1
customer
LACSD
datetime
2020-02-21T02:11:15-08:00
documentation
PROPIPE
is_lateral_inspection
false