Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 21, 2020, 11:04 AM
  • 04 0079_04 0078A _02212020_043038.mp4

Date
02/21/2020
W/O
813450
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00415
PipeID
P11817
Time
3:04 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7415
Sewer Name
04 SHERMAN TRUNK
City
WEST HOLLYWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_813450_TV04009_FEB2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
04 0079
Downstream MH
04 0078A
Dir. of Survey
Downstream
Length Surveyed
318.5 ft.
Total Length
318.5 ft.
Structural Index
3
Structural Quick
5146
Structural Rating
217
O&M Index
2
O&M Quick
312X
O&M Rating
255
Overall Index
2
Overall Quick
Overall Rating
472
Pipe schematic from manhole 04 0079 to 04 0078A
MH: 04 0079MH: 04 0078Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES IN MH0 ft. AMH - Upstream Manhole, Survey Begins - 04 00792 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS36.4 ft. RFL - Roots Fine Lateral, at 10 o'clock36.4 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"39.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"84.8 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"122.9 ft. RFL - Roots Fine Lateral, at 02 o'clock122.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"132.6 ft. RML - Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: NO132.6 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"138.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"180 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start182.7 ft. HVV - Hole Void Visible, from 10 to 11 o'clock, within 8 inches of joint: YES191.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"212.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish214.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"222.2 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"255.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"268.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"313.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"316 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - Throughout the reach from 9 to 3oclock316.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"316.8 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish316.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish316.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish318.5 ft. AMH - Downstream Manhole, Survey Ends - 04 0078A318.5 ft. MGO - General Observation - ROACHES IN MH318.5 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK

Observation photos (10)

  • General Observation - ROACHES IN MH

    0 ft. - General Observation - ROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - MINERALS

    7.2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS

  • Roots Fine Lateral, at 10 o'clock

    36.4 ft. - Roots Fine Lateral, at 10 o'clock

  • Roots Fine Lateral, at 02 o'clock

    122.9 ft. - Roots Fine Lateral, at 02 o'clock

  • Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: NO

    132.6 ft. - Roots Medium Lateral, at 10 o'clock, 15 %, within 8 inches of joint: NO

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    180 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Hole Void Visible, from 10 to 11 o'clock, within 8 inches of joint: YES

    182.7 ft. - Hole Void Visible, from 10 to 11 o'clock, within 8 inches of joint: YES

  • General Observation - ROACHES IN MH

    318.5 ft. - General Observation - ROACHES IN MH

Observations (35)

DistanceCodeObservation
7.2CM
182.7HVV
36.4RFL
138.4TFA
0MWL
122.9RFL
222.2TBA
0MWM
255.3TFA
82.2TFA
268.4TFC
39.2TFA
84.8TFA
7.2DAZMINERALS
36.4TFA
316SSSThroughout the reach from 9 to 3oclock
313.8TFC
132.6RML
191.7TF
132.6TFA
318.5AMH04 0078A
176.6TFA
0MGOROACHES IN MH
122.9TFA
212.2FM
214.6TFA
316.4TFA
0AMH04 0079
2DAGS
316.8DAZ
180FM
316.8CM
316.8DAGS
318.5MGOROACHES IN MH
318.5MGOCONNECTION AT MH 9 OCLOCK

Properties (6)

additional_info
SC398804
custom_field_two
2
customer
LACSD
datetime
2020-02-21T03:04:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false