Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 21, 2020, 08:52 AM
  • 04 0070_04 0069A _02212020_021305.mp4

Date
02/21/2020
W/O
813450
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00415
PipeID
P11806
Time
12:52 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7415
Sewer Name
04 SHERMAN TRUNK
City
WEST HOLLYWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_813450_TV04009_FEB2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
04 0070
Downstream MH
04 0069A
Dir. of Survey
Downstream
Length Surveyed
302.8 ft.
Total Length
302.8 ft.
Structural Index
3
Structural Quick
3J21
Structural Rating
173
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
2
Overall Quick
Overall Rating
289
Pipe schematic from manhole 04 0070 to 04 0069A
MH: 04 0070MH: 04 0069Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 04 00700 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS2.1 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES11.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish20.8 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS20.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.1 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"43.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"68.8 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"94.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"107.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"118.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"178.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.4 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"243.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"249.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"268.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"302 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - Spalling Throughout the reach, from 9 to 3 oclock302.8 ft. AMH - Downstream Manhole, Survey Ends - 04 0069A302.8 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK302.8 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish302.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

    2.1 ft. - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - MINERALS

    20.8 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
107.6TFA
11.5DSZ
271.8TFC
178.3TFC
43.3TFA
302.8AMH04 0069A
196.4TFA
94.5TFA
243.7TFC
302.8MGOCONNECTION AT MH 9 OCLOCK
118.4TFA
68.8TFA
120.7TFA
2DSZDEBRIS
20.8DAZMINERALS
302.8DAZ
2.1CM
268.8TFC
302SSSSpalling Throughout the reach, from 9 to 3 oclock
249.8TFA
20.8CM
0AMH04 0070
30.1TFA
0MWL
302.8CM

Properties (6)

additional_info
SC398804
custom_field_two
3
customer
LACSD
datetime
2020-02-21T00:52:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false