Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 21, 2020, 09:47 AM
  • 04 0068_04 0047 _02212020_031200.mp4

Date
02/21/2020
W/O
813450
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00415
PipeID
P11803
Time
1:47 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7415
Sewer Name
04 SHERMAN TRUNK
City
WEST HOLLYWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
03
Purpose
Routine Assessment
Project
RFIR_WO_813450_TV04009_FEB2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
04 0068
Downstream MH
04 0047
Dir. of Survey
Downstream
Length Surveyed
324.5 ft.
Total Length
324.5 ft.
Structural Index
3
Structural Quick
4122
Structural Rating
8
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 04 0068 to 04 0047
MH: 04 0068MH: 04 0047downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 04 00680 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish22.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"33.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"62 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS101.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"132.2 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES132.2 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"139.5 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Start139.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"144 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Finish179.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"195.3 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES195.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"259 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"322.6 ft. MGO - General Observation - ROACHES IN MH322.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish322.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish324.5 ft. MGO - General Observation - CONNECTION AT MH 9 AND 12 OCLOCK324.5 ft. AMH - Downstream Manhole, Survey Ends - 04 0047

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    94.4 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    132.2 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

  • Deposits Settled Compacted,  10 %of cross sectional area, from 07 to 09 o'clock,  , within 8 inches of joint: YES, Start

    139.5 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    195.3 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • General Observation - ROACHES IN MH

    322.6 ft. - General Observation - ROACHES IN MH

Observations (29)

DistanceCodeObservation
22.2FM
324.5MGOCONNECTION AT MH 9 AND 12 OCLOCK
139.5DSC
7FM
22.4TF
0MGOCONNECTION AT MH 9 OCLOCK
139.8TFC
322.6MGOROACHES IN MH
0AMH04 0068
179.8TF
0MWL
324.5AMH04 0047
94.4DSZDEBRIS
132.2CL
195.3CL
0MWM
101.3TFC
2DAGS
33.4TBA
322.6DSZ
62TF
259TF
206.1TFC
195.3TBA
144DSC
85.3TFC
219.2TFC
322.6DAGS
132.2TBA

Properties (6)

additional_info
SC398804
custom_field_two
3
customer
LACSD
datetime
2020-02-21T01:47:29-08:00
documentation
PRO PIP
is_lateral_inspection
false