Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 12, 2020, 10:12 AM
  • 10_1_2_12032020_032103.mp4

Date
03/12/2020
W/O
0818533
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00208
PipeID
P00908
Time
3:12 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0324
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20200310MDM_HOLMES_WILLOWBROOK_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
01 0427
Downstream MH
01 0426
Dir. of Survey
Downstream
Length Surveyed
305.9 ft.
Total Length
305.9 ft.
Structural Index
3
Structural Quick
4L3G
Structural Rating
491
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
493
Pipe schematic from manhole 01 0427 to 01 0426
MH: 01 0427MH: 01 0426downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:20AM0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE6.2 ft. MGO - General Observation - 30% MAG COAT START21.6 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG27.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB32.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB41.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT UNDER MAG COAT50.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB55.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB58.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE67 ft. DSZ - Deposits Settled Other, 0 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCKS76.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB81 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB99.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB104.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB109 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN116.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB116.7 ft. MGO - General Observation - 30% MAG FINISH131.9 ft. MGO - General Observation - 10% MAG COAT START152.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB175.3 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG181 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB195.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB201 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB215.7 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE221.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB234.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish - SLIGHT247.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB252.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB272.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB277.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB282.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB300.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB305.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG305.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE305.4 ft. MGO - General Observation - 10% MAG FINISH305.4 ft. MGO - General Observation - MH CONN 3:00 ACTIVE305.9 ft. AMH - Downstream Manhole, Survey Ends - 3:55AM

Observation photos (6)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - 30% MAG COAT START

    6.2 ft. - General Observation - 30% MAG COAT START

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    21.6 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT UNDER MAG COAT

    41.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT UNDER MAG COAT

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    175.3 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (42)

DistanceCodeObservation
104.2TFCSTUB
32.8TFCSTUB
300.5TFCSTUB
221.8TFCSTUB
2SAMSEVERE AGG
0AMH3:20AM
50.7TFCSTUB
201TFCSTUB
0MGOMH CONN 3:00 ACTIVE
67DSZROCKS
116.7TFCSTUB
181TFCSTUB
99.2TFCSTUB
76.2TFCSTUB
305.4SAMSEVERE AGG
252.1TFCSTUB
272.4TFCSTUB
58.4TBAACTIVE
277.3TFCSTUB
131.9MGO10% MAG COAT START
305.9AMH3:55AM
41.8FLSLIGHT UNDER MAG COAT
109TFOPEN
55.6TFCSTUB
282.6TFCSTUB
81TFCSTUB
6.2MGO30% MAG COAT START
305.4SSSBLISTERING PEELING CONCRETE
0MWL
2SSSBLISTERING PEELING CONCRETE
247.1TFCSTUB
195.8TFCSTUB
0MWM
152.5TFCSTUB
27.8TFCSTUB
116.7MGO30% MAG FINISH
234.3FLSLIGHT
305.4MGO10% MAG FINISH
175.3SAMSEVERE AGG
215.7TFAACTIVE
21.6SAMSEVERE AGG
305.4MGOMH CONN 3:00 ACTIVE

Properties (6)

custom_field_three
SEVERE AGG MISSING- SLIGHT FRACTURE JOINT % LONGER
custom_field_two
2
customer
LACSD
datetime
2020-03-12T03:12:03-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false