1_1_3_05032020_030522.mp4
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - 10% MAG COAT START
12.2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
17.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
30.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED
61.6 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
96.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - MULTILAYER PEELING CONCRETE SEVERE AGG ATTACHED
159.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED
223.6 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - DEEP PEELING
224.3 ft. - Deposits Settled Other, 5 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE SEVERE AGG ATTACHED
| Distance | Code | Observation |
|---|---|---|
| 224.3 | DSZ | PEELED CONCRETE SEVERE AGG ATTACHED |
| 138.9 | TF | OPEN |
| 96.1 | SSS | MULTILAYER PEELING CONCRETE SEVERE AGG ATTACHED |
| 30.2 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 0 | AMH | 2:55AM |
| 274.5 | TF | OPEN |
| 17.6 | SSS | PEELING CONCRETE |
| 301.5 | TF | OPEN |
| 0 | MWM | — |
| 159.1 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 310.2 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 141.9 | TF | OPEN |
| 12.2 | SAM | SEVERE AGG |
| 310.2 | SAM | SEVERE AGG |
| 238.1 | TF | OPEN |
| 0 | MWL | — |
| 310.2 | MGO | 10% MAG COAT FINISH |
| 310.8 | AMH | 2:35AM |
| 61.6 | SAM | SEVERE AGG |
| 2 | SAM | SEVERE AGG |
| 223.6 | SAM | DEEP PEELING |
| 2 | MGO | 10% MAG COAT START |