Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 16, 2020, 11:31 AM
  • A 0713_A 0712 _01162020_034053.mp4

Date
01/16/2020
W/O
803067
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07922
Time
3:31 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7240
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
POMONA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
14
Purpose
Routine Assessment
Project
WO_803067_TV21025_DEC2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
A 0713
Downstream MH
A 0712
Dir. of Survey
Downstream
Length Surveyed
333.7 ft.
Total Length
333.7 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
316
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole A 0713 to A 0712
MH: A 0713MH: A 0712downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 07130 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. MGO - General Observation - 60% MAG COAT THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start331 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish332.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.7 ft. AMH - Downstream Manhole, Survey Ends - A 0712

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    37.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
332.3SAV
0AMHA 0713
2MGO60% MAG COAT THROUGHOUT
0MWM
0MWL
331DAGS
333.7SSS
2DAGS
333.7AMHA 0712
37.4SSS
4.1SAV

Properties (7)

additional_info
SC398535
custom_field_two
3
customer
LACSD
datetime
2020-01-16T03:31:29-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26232