Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 15, 2020, 07:21 AM
  • A 0700_A 0699 _01142020_233919.mp4

Date
01/14/2020
W/O
803067
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07909
Time
11:21 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7238
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
POMONA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
18
Purpose
Routine Assessment
Project
WO_803067_TV21025_DEC2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
A 0700
Downstream MH
A 0699
Dir. of Survey
Downstream
Length Surveyed
788.5 ft.
Total Length
788.5 ft.
Structural Index
3
Structural Quick
5^3^
Structural Rating
1570
O&M Index
2
O&M Quick
2^00
O&M Rating
314
Overall Index
3
Overall Quick
Overall Rating
1884
Pipe schematic from manhole A 0700 to A 0699
MH: A 0700MH: A 0699downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 07002 ft. MGO - General Observation - 75% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.4 ft. MGO - General Observation - MAG COAT141.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"786 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish786 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish786 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish787 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish788.5 ft. AMH - Downstream Manhole, Survey Ends - A 0699

Observation photos (1)

  • Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    141.9 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (15)

DistanceCodeObservation
3.4MGOMAG COAT
0MWL
786DAGS
2MGO75% MAG COAT
787SAP
0MWM
141.9TFA
0AMHA 0700
788.5AMHA 0699
786SRV
786SSS
2DAGS
2SRV
2SSS
2SAP

Properties (7)

additional_info
SC398533
custom_field_two
4
customer
LACSD
datetime
2020-01-14T23:21:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26232