Wastewater/Activity/PacpInspection/1.0Feb 19, 2020, 09:48 AM
  • 14 0250A_14 0250 _02192020_020408.mp4

Date
02/19/2020
W/O
808082
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18306
Time
1:48 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7414
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_808082_TV14037_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
14 0250A
Downstream MH
14 0250
Dir. of Survey
Downstream
Length Surveyed
174.2 ft.
Total Length
174.2 ft.
Structural Index
3
Structural Quick
513F
Structural Rating
175
O&M Index
2
O&M Quick
412F
O&M Rating
72
Overall Index
2
Overall Quick
Overall Rating
247
Pipe schematic from manhole 14 0250A to 14 0250
MH: 14 0250AMH: 14 0250downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 0250A0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start171 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - Throughout the reach171.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish171.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish171.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish174.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0250

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2DAGS
171SRVThroughout the reach
0MWM
171.9SAP
171.9SSS
174.2AMH14 0250
2SSS
0MWL
171.9DAGS
2SAP
0AMH14 0250A
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (6)

additional_info
SC398803
custom_field_two
2
customer
LACSD
datetime
2020-02-19T01:48:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false