Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2020, 10:28 AM
  • 14 0248_14 0247A_02172020_023537.mp4

Date
02/17/2020
W/O
808082
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18303
Time
2:28 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7409
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_808082_TV14037_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0248
Downstream MH
14 0247A
Dir. of Survey
Downstream
Length Surveyed
186.2 ft.
Total Length
186.2 ft.
Structural Index
3
Structural Quick
5E3F
Structural Rating
340
O&M Index
2
O&M Quick
2F00
O&M Rating
72
Overall Index
3
Overall Quick
Overall Rating
412
Pipe schematic from manhole 14 0248 to 14 0247A
MH: 14 0248MH: 14 0247Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 02480 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start25.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start183.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish183.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish183.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish183.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish186.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK186.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0247A

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    25.4 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2SAP
0AMH14 0248
25.4SRV
2SSS
2DAGS
0MWL
0MWM
183.8SRV
183.8SAP
183.8DAGS
186.2MGOCONNECTION AT MH 9 O'CLOCK
183.8SSS
186.2AMH14 0247A

Properties (6)

additional_info
SC398798
custom_field_two
2
customer
LACSD
datetime
2020-02-17T02:28:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false