Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 14, 2020, 09:08 AM
  • 14 0246_14 0245 _02142020_013013.mp4

Date
02/14/2020
W/O
808082
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18300
Time
1:08 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7407
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_808082_TV14037_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0246
Downstream MH
14 0245
Dir. of Survey
Downstream
Length Surveyed
597.4 ft.
Total Length
597.4 ft.
Structural Index
3
Structural Quick
513W
Structural Rating
600
O&M Index
2
O&M Quick
2W00
O&M Rating
238
Overall Index
2
Overall Quick
Overall Rating
838
Pipe schematic from manhole 14 0246 to 14 0245
MH: 14 0246MH: 14 0245downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 02460 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start595 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - Throughout the reach595.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish595.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish595.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish597.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0245

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
595.1SAP
0AMH14 0246
597.4AMH14 0245
0MWL
595SRVThroughout the reach
2SSS
595.1SSS
2DAGS
0MWM
595.1DAGS
2SAP

Properties (6)

additional_info
SC398796
custom_field_two
2
customer
LACSD
datetime
2020-02-14T01:08:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false