Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 14, 2020, 10:36 AM
  • 14 0239A_14 0239_02142020_025520.mp4

Date
02/14/2020
W/O
808082
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00569
PipeID
P18292
Time
2:36 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7407
Sewer Name
14 AVENUE "H" TRUNK
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_808082_TV14037_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
14 0239A
Downstream MH
14 0239
Dir. of Survey
Downstream
Length Surveyed
491.6 ft.
Total Length
491.6 ft.
Structural Index
3
Structural Quick
513R
Structural Rating
490
O&M Index
2
O&M Quick
412R
O&M Rating
198
Overall Index
2
Overall Quick
Overall Rating
688
Pipe schematic from manhole 14 0239A to 14 0239
MH: 14 0239AMH: 14 0239downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 0239A0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start489 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - Throughout the reach489.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish489.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish489.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish491.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0239

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMH14 0239A
491.6AMH14 0239
0MWM
489.1DAGS
2SAP
2DAGS
2SSS
489.1SSS
489.1SAP
489SRVThroughout the reach
0MWL

Properties (6)

additional_info
SC398796
custom_field_two
2
customer
LACSD
datetime
2020-02-14T02:36:58-08:00
documentation
PRO PIPE
is_lateral_inspection
false