Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 31, 2020, 06:48 AM
  • 02 1087_02 1086 _01302020_230545.mp4

Date
01/30/2020
W/O
808211
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00282
PipeID
P03661
Time
10:48 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7248
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_808211_TV02212_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Square
Height
18 in.
Width
18 in.
Upstream MH
02 1086
Downstream MH
02 1087
Dir. of Survey
Upstream
Length Surveyed
334.8 ft.
Total Length
334.8 ft.
Structural Index
3
Structural Quick
5A3L
Structural Rating
250
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
250
Pipe schematic from manhole 02 1086 to 02 1087
MH: 02 1086MH: 02 1087upstream0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 02 10870.8 ft. MGO - General Observation - Possible Magnesium Hydroxide Coat , 9 to 3 oclock, 50% intact0.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - Throughout the reach12.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"38.6 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start53 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"53.5 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO101.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"110.4 ft. SRV - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: NO158.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"206.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"255.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"332.4 ft. MGO - General Observation - MAG COAT332.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start334.7 ft. MWM - Water Mark, 10 %of cross sectional area334.8 ft. AMH - Downstream Manhole, Survey Begins - 02 1086334.8 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: NO

    224.4 ft. - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO

    281.3 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    296.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
0.1MWM
233TFC
334MGOPossible Magnesium Hydroxide Coat , 9 to 3 oclock, 50% intact
334SSSThroughout the reach
296.2SRV
334.8SAP
176.5TFC
281.3SRV
2.4MGOMAG COAT
127.9TFC
0AMH02 1086
79.1TFC
2.4SAP
281.8TFC
334.8SRV
322.2TFC
0MWL
224.4SRV
334.8AMH02 1087

Properties (6)

additional_info
SC398547
custom_field_two
2
customer
LACSD
datetime
2020-01-30T22:48:21-08:00
documentation
PROPIPE
is_lateral_inspection
false