Wastewater/Activity/PacpInspection/1.0Jan 31, 2020, 06:32 AM
  • 02 1086_02 1085 _01302020_224605.mp4

Date
01/30/2020
W/O
808211
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00282
PipeID
P03660
Time
10:32 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7248
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_808211_TV02212_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1085
Downstream MH
02 1086
Dir. of Survey
Upstream
Length Surveyed
317.8 ft.
Total Length
317.8 ft.
Structural Index
4
Structural Quick
5G3L
Structural Rating
386
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
386
Pipe schematic from manhole 02 1085 to 02 1086
MH: 02 1085MH: 02 1086upstream0 ft. AMH - Upstream Manhole, Survey Ends - 02 10860.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - Throughout the reach0.8 ft. MGO - General Observation - Possible Magnesium Hydroxide Coat throughout, 9 to 3 oclock, 50% intact26.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"74.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"123.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"188 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start189.3 ft. SRV - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO278.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"315.5 ft. MGO - General Observation - MAG COAT315.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start317.8 ft. AMH - Downstream Manhole, Survey Begins - 02 1085317.8 ft. MWL - Water Level, 5 %of cross sectional area317.8 ft. MWM - Water Mark, 10 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO

    128.5 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    129.8 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0AMH02 1085
2.3MGOMAG COAT
194TFA
317SSSThroughout the reach
243TFC
317MGOPossible Magnesium Hydroxide Coat throughout, 9 to 3 oclock, 50% intact
2.3SAP
317.7SAP
39.3TF
128.5SRV
0MWL
129.8SRV
291.7TFC
0MWM
317.8AMH02 1086
317.7SRV

Properties (6)

additional_info
SC398547
custom_field_two
2
customer
LACSD
datetime
2020-01-30T22:32:18-08:00
documentation
PROPIPE
is_lateral_inspection