Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 31, 2020, 07:32 AM
  • 02 1083_02 1082 _01302020_234519.mp4

Date
01/30/2020
W/O
808211
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00282
PipeID
P03657
Time
11:32 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7248
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_808211_TV02212_JAN2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1083
Downstream MH
02 1082
Dir. of Survey
Downstream
Length Surveyed
327.3 ft.
Total Length
327.3 ft.
Structural Index
4
Structural Quick
5J3L
Structural Rating
482
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
482
Pipe schematic from manhole 02 1083 to 02 1082
MH: 02 1083MH: 02 1082downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10830 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK3.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"83.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"327 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - Throughout the reach327 ft. MGO - General Observation - Possible Magnesium Hydroxide Coat throuhout the reach, 50% intact327.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1082

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    42.7 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
42.7SRV
44.8TFC
327.3AMH02 1082
83.3TF
327SSSThroughout the reach
327MGOPossible Magnesium Hydroxide Coat throuhout the reach, 50% intact
327.2SRV
0MWL
3.8SAP
0AMH02 1083
0MWM
327.2SAP
0MGOCONNECTION AT MH 3 O'CLOCK

Properties (6)

additional_info
SC398547
custom_field_two
2
customer
LACSD
datetime
2020-01-30T23:32:23-08:00
documentation
PROPIPE
is_lateral_inspection
false