Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2020, 05:55 AM
  • 32 1009_32 1008_02102020_234604.mp4

Date
02/10/2020
W/O
808159
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19457
Time
9:55 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7404
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_808159_TV32025_JAN2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
32 1009
Downstream MH
32 1008
Dir. of Survey
Downstream
Length Surveyed
339.5 ft.
Total Length
339.5 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
332
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
466
Pipe schematic from manhole 32 1009 to 32 1008
MH: 32 1009MH: 32 1008downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 10090 ft. MWL - Water Level, 15 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start168.8 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"250 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: YES, 3"335.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish335.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish336 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.5 ft. AMH - Downstream Manhole, Survey Ends - 32 1008

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
5.7CM
2SSS
0MWM
339.5AMH32 1008
336SSS
250TBA
0AMH32 1009
0MWL
335.8DAGS
168.8TBA
0DAGS
335.8CM

Properties (6)

additional_info
SC398793
custom_field_two
3
customer
LACSD
datetime
2020-02-10T21:55:07-08:00
documentation
PRO PIPE
is_lateral_inspection
false